Canada

Hemmingford

Product P1
System Size 1.2 MW / 2.4 MWh, duration: 2 hours
Commissioning 2017

At the time of its commissioning, the Hemmingford BESS was the largest energy storage system in the Quebec province.

Our battery energy storage system was designed to:

  • Postpone important infrastructure investments needed to support the growth of energy demand at the local substation.
  • Be used during daily and seasonal peaks to provide power quality, reactive power and voltage support and improve grid resilience.

Ready to start a project?

Privacy Policy | Terms of Use