Product | EVLO 1000 |
---|---|
System Size | 4 MW / 20 MWh, duration: 5 hours |
Commissioning | Phase 1: 2022, Phase 2: 2023 |
Hydro-Québec carried out work on a 58-km long transmission line in a remote community.
Our battery energy storage system was designed to:
- Supply the region’s residential and commercial customers for the entire duration of the work, while limiting the use to diesel generators.
- Now that the work is completed, the system will remain in place to manage peaks on the grid and serve as an auxiliary source in the event of an outage.
- First deployment of the EVLO 1000 product line.