Troy

Product EVLO 1000
System Size 3 MW / 12 MWh, duration: 4 hours
Commissioning 2024

Troy is located in the Sheffield-Highgate Export Interface (“SHEI”), a constrained transmission corridor where renewable energy generation often outpaces demand.

The Troy project’s BESS will absorb excess power at times of curtailment and discharge the clean energy to the New England grid to manage peak demand and reduce power export constraints.

  • Renewable energy absorption and peak management
  • Power export constraints management