United States
Facility microgrid in Virginia

Product | EVLOFLEX |
---|---|
System Size | 1.65 MW / 5 MWh |
Commissioning | 2025 |
The 2020 Virginia Clean Economy Act (VCEA) requires its state utilities to transition to 100% clean energy by 2050. This microgrid project will be driven by solar power and battery storage.
Our battery energy storage system was designed to:
- Study and learn how BESS can improve grid stability and support the energy transition.
Read our Press Release